Friday, October 9, 2015

Day 55 - Concrete Poured

The concrete for the garage, front porch and basement was poured today.  They even moved the 220 line for the air conditioner to the spot we wanted.  Everything looks great.  Our FM provided the following schedule for next week:
  • Mon - lumber delivered and siding installed
  • Tues/Weds - the rest of the roughing down in the basement
  • Thurs - furnace and electrical
  • Fri - plumbing again
Air conditioner moved to the perfect spot.

Garage done with the floor drain.



Front porch looks great.

Lots of basement pics although I'm not sure what this pipe is.






No comments:

Post a Comment