- Mon - lumber delivered and siding installed
- Tues/Weds - the rest of the roughing down in the basement
- Thurs - furnace and electrical
- Fri - plumbing again
Air conditioner moved to the perfect spot. |
Garage done with the floor drain. |
Front porch looks great. |
Lots of basement pics although I'm not sure what this pipe is. |
No comments:
Post a Comment