Wednesday, December 9, 2015

Day 116 - Door Handles, Trim, Columns, and Stairs

Today was another great day to come home to a lot of progress.  The wife was very excited to see the stairs complete and they look amazing.  The living room column came in and the outside columns were delivered and should go in today.  All of the baseboard is in for the entire house. 

Our FM notified us that he'll be at the house at 7:30am so that we can meet him to talk about a few things.  Here is the list of items we wanted to talk to him about:
  • Now that the locks are on the doors can we start bringing over some items to get locked up (fans, disposal, etc.)
  • Get an update on the schedule for our excavator to tie-in the down spouts
  • Discuss the height of the fireplace mantle
  • We can't seem to find where the light switch is for the pantry light
  • Placement and setup of the barn doors in the master bedroom
  • Bathroom counter tops pricing to replace (we aren't too fond of them)
Front door handle with lock is on.

Railing going to the upstairs.

Stairs leading the upstairs.  Step will be dark brown to match the floor and the risers will be white.

Lots of dust but the column looks amazing.

Here are the columns that will go outside.

Upstairs banister looks great.  The wood pieces will be stained to match the steps.


Basement stairs on in with the handrail.

All of the baseboards are in.

No comments:

Post a Comment