Friday, September 11, 2015

Day 31 - Lot Prepped

Today things looked great, level, and ready for framing.  I saw one thing that concerned me today; the water line was installed in the front right below the porch.  The problem is that it seems to be coming in right where stair walkway is.  I sent a picture over to my FM voicing my concern.

You can see the footer where the stairs will be and the pipe is at waist height.  Unless it's going to take some immediate turn coming into the house I think it's going to be a problem. 


I almost drove right into the garage to test it out.

No comments:

Post a Comment