Tuesday, September 29, 2015

Day 46 - Plumbing

We were surprised to see that all of the plumbing looked pretty much done.  Lots of work in the basement with the sump pump being connected to the outside line so no more need for the hose to the back yard.  Shower and tub were in upstairs and the Jefferson made sure to point out where all of the toilets are at.  Noticed that the gas line was in for the fireplace.  Lastly it looked like there was a spot in the mudroom where the heating ducts were crimped to fit in some water lines (we'll see if that's going to be an issue or not).

Tomorrow is going to be a fun day with an 8am appointment with the electrician to walk through the house.  I printed out some paper to allow us to mark where we want outlets, switches, and lighting.

Sump pump connected to the outside.

Downstairs bathroom roughed in.

Gas-line from fireplace coming downstairs.

Looks like the trades got into an argument.

Plumbing for the laundry room.  Hope this isn't going to be an issue since we have a cabinet and the washer and dryer are tucked away.  I expected this to go on the exterior wall but I hope it's not an issue.



Gas-line to fireplace.


1st floor powder room sink.

Looks pressurized to me.

We marveled at the maze of plumbing in the ceilings all connected to this pipe running into the ceiling.

Jefferson's bath tub.

Our master bath soaker tub.

Master bath shower.

Toilet.

Not sure what this pipe is for sticking out of the west side of the house.

First time I noticed this sticking out from the outside of the house for the fireplace.
I might have gone overboard here but Jenn is a visual person and this will help everyone.

No comments:

Post a Comment