The carpet is supposed to be installed today but I'm not sure that is going to happen with the mess the house is in right now. We e-mailed our FM and he assured us it was still on. The wife is very concerned that the rest of the trades are going to make a mess on the brand new carpeting.
Our FM gave us an updated schedule on 1/23:
- 1/23-1/27 - Flooring
- 1/27 - Carpet install
- 1/28 - Countertop switch outs
- 1/29 - Plumbing
- 2/1 - Cleaning
- 2/2-2/3 - Painting touch-ups (we may need to take some time off to be there for this)
Some other random thoughts:
- Wondering if it's going to be warm enough to put in the driveway and sidewalks before we move in - still waiting on a quote from our new excavator
- We have appliance deliveries scheduled for 2/11 so hopefully that works out
- We've decided on the tile back-splash and now just waiting on the price quote along with timing to install
- It's probably a good time to start getting some estimates for fence installation as well as we had that in our PPI's